Glossary entry

English term or phrase:

OCC wind load

Russian translation:

случайная ветровая нагрузка

    The asker opted for community grading. The question was closed on 2018-03-20 16:54:08 based on peer agreement (or, if there were too few peer comments, asker preference.)
Mar 17, 2018 16:06
6 yrs ago
1 viewer *
English term

OCC wind load

English to Russian Tech/Engineering Engineering: Industrial Vessels and piping
Приведена таблица нагрузок на штуцеры трубопровода.
Интересует сокращение OCC.

Proposed translations

+1
9 mins
Selected

случайная ветровая нагрузка

Peer comment(s):

agree Turdimurod Rakhmanov : Да это так, точно. OCC occasional OPE Operating
2 mins
спасибо!
Something went wrong...
4 KudoZ points awarded for this answer. Comment: "Thanks"
11 mins

occasianal wind load

случайных воздействий ветровой нагрузки на
Something went wrong...
19 mins

случайная ветровая нагрузка

OCC = сокращение от "occasional"

Еще есть такие виды нагрузок на трубопровод, как длительная (Sustained = SUS), рабочая (operating = OPE), нагрузка при гидроиспытаниях HYD и т.д.

http://www.whatispiping.com/load-cases
a. Hydrotesting case: Pipelines are normally hydrotested before actual operation to ensure absence of leakage. Water is used as the testing medium. So during this situation pipe will be subjected to water weight and hydrotest pressure.
Accordingly our first load case in Caesar II will be as mentioned below
1. WW+HP HYD
b. Operating case: When operation starts working fluid will flow through the piping at a temperature and pressure. So accordingly our operating load cases will be as mentioned below:

2. W+T1+P1 OPE for operating temperature case
3. W+T2+P1 OPE for maximum system temperature case
4. W+T3+P1 OPE for minimum system temperature case

c. Sustained Case: Sustained loads will exist throughout the plant operation. Weight and pressure are known as sustained loads. So our sustained load case will be as follows:
5. W+P1 SUS
d. Occasional Cases: Piping may be subjected to occassional wind and seismic forces. So to check stresses in those situations we have to build the
following load cases:
6. W+T1+P1+WIN1 OPE Considering wind from +X direction
7. W+T1+P1+WIN2 OPE Considering wind from -X direction
8. W+T1+P1+WIN3 OPE Considering wind from +Z direction
9. W+T1+P1+WIN4 OPE Considering wind from -Z direction
10. W+T1+P1+U1 OPE Considering seismic from +X direction
11. W+T1+P1-U1 OPE Considering seismic from -X direction
12 W+T1+P1+U2 OPE Considering seismic from +Z direction
13 W+T1+P1-U2 OPE Considering seismic from -Z direction

While stress analysis the above load cases form load case 6 to load case 13 is generated only to check loads at node points.
To find occasional stresses we need to add pure occassional cases with sustained load and then compare with code allowable values. Following sets of load cases are built for that purpose.
14. L6-L2 OCC Pure wind from +X direction
15. L7-L2 OCC Pure wind from -X direction
16. L8-L2 OCC Pure wind from +Z direction
17. L9-L2 OCC Pure wind from -Z direction
Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search