Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
- Mar 21 '17 por>eng camada de fundido slag layer pro closed ok
- Mar 4 '17 por>eng Disciplina de Projeto engineering disciplines pro closed ok
4 Mar 5 '17 por>eng rampeamento de taludes slope battering pro closed no
4 Mar 3 '17 por>eng galgamento de peças alignment/straightening of parts pro closed ok
- Mar 1 '17 por>eng Base provision pro closed ok
4 Feb 28 '17 por>eng sanação in radice radical sanation pro closed no
4 Feb 27 '17 por>eng cruzeta upper bracket pro closed no
4 Feb 24 '17 por>eng terreno acrescido de marinha marine marginal land increments pro closed ok
- Feb 24 '17 por>eng mandris boring tools pro closed ok
4 Feb 19 '17 por>eng baixa clearance pro closed no
4 Feb 19 '17 por>eng conferente de mercadoria tallyman pro closed no
4 Feb 12 '17 por>eng Metalo-eletro-mecânica (electro)mechanical metallurgy pro closed no
- Jan 21 '17 por>eng ruflas butt splices pro open no
4 Jan 21 '17 por>eng feixe flutuante wing walls pro closed no
- Jan 18 '17 por>eng Delegacia (da Capitania dos Portos) harbor master's office pro closed no
4 Jan 12 '17 por>eng Do saneamento de falhas formais Formal error remediation pro closed ok
4 Feb 24 '16 por>eng empilhadeira de lança dupla twin boom stacker pro closed ok
- Feb 8 '16 por>eng minério do futuro sterile ore pro open no
4 Feb 19 '16 por>eng corpo e morro center and slope/sides pro closed ok
4 Feb 18 '16 por>eng Equipamentos taqueados tagged equipment pro closed ok
- Feb 15 '16 por>eng muro de encosto single face wall pro closed ok
4 Feb 13 '16 por>eng Corte Verde green concrete joint surface preparation pro closed ok
- Feb 12 '16 por>eng armados os módulos das estacas the modules/segments from stakes 0 to 8 are having the reinforcement assembled pro just_closed no
4 Aug 22 '15 por>eng chave seletora e de carga tap selector and diverter switch pro closed no
4 Aug 11 '15 por>eng barras (in the below context) sections pro closed no
4 Aug 5 '15 por>eng 1ª Promotoria Empresarial Corporate Affairs Prosecution Office 1 pro closed no
4 Jul 31 '15 por>eng Cabeça de tração lado fundo umbilical pull head, deep side pro closed no
4 Jul 24 '15 por>eng fundeio interno intermediário dropped anchor (temporarily) in an inner anchorage area pro closed no
4 Jul 23 '15 por>eng sair barra sail/depart pro closed no
- Jul 16 '15 por>eng jazida Unitizável deposits/reservoirs subject to unitization (agreements) pro closed ok
4 Jul 16 '15 por>eng madres metálicas steel purlins pro closed no
- Jul 11 '15 por>eng andar de transmissão partial transmission pro just_closed no
4 Jul 10 '15 por>eng Sentença de conhecimento judgment pro closed ok
- Jul 5 '15 por>eng EMISSÃO PONTUAL Point Source emissions pro closed ok
4 Jul 3 '15 por>eng desconfinamento do solo soil deconfinement pro closed no
- Jul 2 '15 por>eng medições financeiras financial measurement reports pro open no
4 Jul 1 '15 por>eng execução de concreto execution of concrete structures pro closed no
4 Jun 24 '15 por>eng Acidez_vol_corrig corrected/adjusted volatile acidity pro closed no
4 Jun 18 '15 por>eng punçoamento punching shear pro closed ok
4 Jun 18 '15 por>eng Pedra tipo quota M/P kota stone standard size pro closed ok
4 Jun 18 '15 por>eng nós deslocáveis pinned joints/connections pro closed ok
4 Jun 14 '15 por>eng algumas chapas de reforço descarregam em uma antepara menor some reinforcement places transmit their forces to a smaller bulkhead pro closed no
4 May 12 '15 por>eng negativos chases pro closed ok
4 May 12 '15 por>eng montantes pillars pro closed ok
4 May 12 '15 por>eng travamentos em cintas bond beams pro closed ok
- Apr 21 '15 por>eng Ponto de Ligação tie-in pro just_closed no
4 Mar 31 '15 por>eng PARTE DIÁRIA daily sheet pro closed no
4 Mar 20 '15 por>eng reivindicações claims pro closed no
4 Mar 19 '15 por>eng Pontes em balaço sucessivo segmental bridges pro closed no
- Mar 8 '15 por>eng grades de paramento face screens pro just_closed ok